top of page
Screen Shot 2022-02-04 at 10.42.40 AM.png

Brix Parking Structure

To provide access to the parking in the existing building, a new 3 level parking structure was built to the west of the existing building. The Brix parking structure has a public park at the top level which has a blue-green roof for rainwater storage following rain events.

Location


Stalls

 

Milwaukee, WI

40

Levels


Year Completed

3

2015

Project Highlights

bottom of page